Foilboard® GREEN rigid insulation panel should be installed to the external face of the studwork, with the anti-glare side is facing out. Measure the area you require.
Mark the measurements out on the Foilboard® panel, using the gridlines as a guide, then using a straight edge and a sharp blade / knife, cut the panel to size.
Position the sheet against the frame. Panels should be butted hard up to any doors, windows and the underside of the roof truss.
Fasten the insulation panel to the studwork with the Foilboard® Fasteners using approx. 5-6 per m2 using either a hammer or drill as required.
Tape all penetrations, joints and gaps using Foilboard® green tape, to minimise cold / hot air transfer.
Use Foilboard® Standard Fasteners (timber frame) for Foilboard® GREEN 10 & GREEN 15 OR
Use Foilboard® Ultra Fasteners for Foilboard® GREEN 20 & GREEN 25
(Use Timber or Steel fasteners depending on application)
Foilboard® Green joining tape